eosl.ai ›
home › replacements › R190W
Migration guide · Cambium Networks

Cambium Networks R190W Replacement: What Cambium Networks Recommends

Cambium Networks support for the Cambium Networks R190W runs to Dec 2028. Time to fold the successor into refresh planning. Cambium Networks's own end-of-life bulletin names the successor below, quoted from the source, with the successor's live support status where EOSL.ai tracks it.

The Cambium Networks-named replacement

Contact Cambium

listed as the recommended replacement on Cambium's Product Life Cycle page — named in the Cambium Networks EOL bulletin ↗ as the migration path.

Contact Cambium is not yet tracked on EOSL.ai — no vendor end-of-life notice has been captured for it, which is typical of current products.

Cambium Networks R190W lifecycle dates

SKU groupEnd of saleEOSL / last supportSource
R190W (end of sale 2024-12)Dec 2024Dec 2028bulletin ↗

Per-part-number replacement mapping (7)

As listed in the Cambium Networks bulletin's migration table for each part number.

End-of-life partDescriptionBulletin-listed replacement
PL-R190WANA-WWR190W AUS/NZ cord, 802.11n 2.4 GHz WLAN routerContact Cambium
PL-R190WEUA-WWR190W EU cord, 802.11n 2.4 GHz WLAN routerContact Cambium
PL-R190WINA-WWR190W India cord, 802.11n 2.4 GHz WLAN routerContact Cambium
PL-R190WNPA-WWR190W No power supply, 802.11n 2.4 GHz WLAN routerContact Cambium
PL-R190WNTA-WWR190W (N Type: Brazil, SA) 802.11n 2.4 GHZ WLAN routerContact Cambium
PL-R190WUKA-WWR190W UK cord, 802.11n 2.4 GHz WLAN routerContact Cambium
PL-R190WUSA-WWR190W US cord, 802.11n 2.4 GHz WLAN routerContact Cambium
Replacement guidance on this page is quoted from Cambium Networks's official end-of-life bulletin (linked above). EOSL.ai sells no hardware and lists no paid placements. This is the manufacturer's stated path, and third-party maintenance past the cutoff is also an option.

Migration questions

What is the replacement for the Cambium Networks R190W?

Cambium Networks's end-of-life bulletin names Contact Cambium as the recommended migration path for the Cambium Networks R190W. The exact wording and any per-part-number mapping are in the linked bulletin.

Is the Cambium Networks R190W end of life?

Cambium Networks support for the Cambium Networks R190W runs to Dec 2028. Time to fold the successor into refresh planning. Full lifecycle dates by part number: https://eosl.ai/system/cambium-r190w/.

Is there a per-part-number replacement mapping for the R190W?

Yes. The bulletin maps replacements at the part-number level for 7 SKUs (for example PL-R190WANA-WW → Contact Cambium). The full table is on this page.

Do I have to buy the Cambium Networks-recommended replacement?

No. The bulletin's named successor is Cambium Networks's suggested path, not an obligation. Teams also keep R190W units running under third-party maintenance after the support cutoff, migrate to a different vendor, or run low-criticality units to failure with the risk documented. See the support-options guide for the trade-offs.

Other Cambium Networks migration guides