eosl.ai
homeExtreme NetworksSummit X670 Switches

Extreme Networks Summit X670 Switches — End-of-Life & EOSL Dates

PAST VENDOR SUPPORTExtreme Networks ended support in July 2026.

Summit X670 Switches — end-of-sale and end-of-service-life dates as published by Extreme Networks in its end-of-sale bulletin "End-of-Sale Notification for X670".

Every tracked Extreme Networks Summit X670 Switches SKU group is past Extreme Networks end of service life (last group Jul 2026). Units in production should be treated as unsupported. For past-EOSL units, weigh third-party maintenance, spares, replacement, or a documented run-to-failure. Extreme Networks’s named migration path: X670G2/X690.

End of sale

Jul 2021

Last date of support

Jul 2026

Part numbers

1

Extreme Networks names X670G2/X690 as the migration pathper the linked bulletin · see its own dates
Check your part numbers in bulk

1

months past last support

Support Runway Score28/100 · Little or no runway
Why this score
  • Past end of service life — 1 month ago
  • Vendor-published date, source-linked
  • Vendor-named replacement / migration path available
  • Category: ethernet switch

Support-lifecycle timing and source confidence only. Higher means more runway. It is not a risk, safety or compliance rating. How it is calculated

Figure 1. Extreme Networks issues no software maintenance and no security fixes for this product. Third-party maintenance, spares or replacement are the paths from here. EOSL.ai sells none of them and takes no placement fee.

Part number in this family

All 1 share the dates above. Find your exact part to confirm.

Part numberDescriptionEnd of saleLast supportStatus
17200Summit X670V-48t-Base-unitJul 2021Jul 2026Past support

Options from here

The Extreme Networks Summit X670 Switches is past Extreme Networks end of service life. These are the paths teams take from here:

Third-party maintenance

Keep it in production past the OEM cutoff with an independent maintainer.

Pre-stock spares

Buy spares now, while units still circulate on the secondary market.

Plan replacement

It is unsupported today. Set a migration timeline and budget.

Run to failure

Low-criticality role: document the risk, harden backups, retire on your terms.

Independent and informational. EOSL.ai sells no hardware and no maintenance, and lists no paid placements. Third-party maintenance keeps unsupported gear in production past the OEM cutoff; whether it fits depends on the role the asset plays.

Extreme Networks Summit X670 Switches — questions

Is the Extreme Networks Summit X670 Switches end of life?

Yes. Every tracked Summit X670 Switches SKU group is past its last date of support.

What is the last date of support for the Summit X670 Switches?

Jul 2026, per the Extreme Networks end-of-sale bulletin.

Where do these Summit X670 Switches dates come from?

Every end-of-sale and end-of-service-life date on this page links to the official Extreme Networks end-of-sale bulletin it was taken from.

What is the replacement for the Summit X670 Switches?

Extreme Networks's end-of-life bulletin lists X670G2/X690 as the recommended migration path for the Summit X670 Switches. Exact per-part-number replacements are in the linked bulletin.

On the same timetable

Embed this status on your wiki or README

A live badge that shows this model's support status and links here — it refreshes when the vendor date changes.

Extreme Networks Summit X670 Switches EOL / EOSL status
<a href="https://eosl.ai/system/extreme-summit-x670-switches/"><img src="https://eosl.ai/badge/extreme-summit-x670-switches.svg" alt="Extreme Networks Summit X670 Switches EOL / EOSL status"></a>
[![Extreme Networks Summit X670 Switches EOL / EOSL status](https://eosl.ai/badge/extreme-summit-x670-switches.svg)](https://eosl.ai/system/extreme-summit-x670-switches/)