eosl.ai
homeIBMPower System 570 Server

IBM Power System 570 Server — End-of-Life & EOSL Dates

PAST VENDOR SUPPORTIBM ended support in October 2019.

IBM Power System 570 Server enterprise server. End-of-support (last date of support / EOSL) date from IBM's Product Lifecycle, linked to the IBM lifecycle page for verification. The end-of-sale date shown is the IBM end-of-marketing date, published as "no longer available for order, withdrawn from market".

Every tracked IBM Power System 570 Server SKU group is past IBM end of service life (last group Oct 2019). Units in production should be treated as unsupported. For past-EOSL units, weigh third-party maintenance, spares, replacement, or a documented run-to-failure.

Available

Jul 2004

End of sale

Aug 2008 – Jan 2011

Last date of support

Mar 2019 – Oct 2019

Part numbers

2

IBM end-of-sale bulletin ↗9117-570 · verified Aug 2026
IBM end-of-sale bulletin ↗9117-MMA · verified Aug 2026
Check your part numbers in bulk

89

months past last support

Support Runway Score10/100 · Little or no runway
Why this score
  • Past end of service life — 89 months ago
  • Vendor-published date, source-linked
  • Category: enterprise server

Support-lifecycle timing and source confidence only. Higher means more runway. It is not a risk, safety or compliance rating. How it is calculated

Figure 1. IBM issues no software maintenance and no security fixes for this product. Third-party maintenance, spares or replacement are the paths from here. EOSL.ai sells none of them and takes no placement fee.

Part numbers in this family

Dates vary across 2 groups in this family, so every row carries its own. Find your exact part before you plan.

Part numberDescriptionEnd of saleLast supportStatus
9117-570IBM Power System 570 Server (enterprise server)Aug 2008Oct 2019Past support
9117-MMAIBM Power System 570 Server (enterprise server)Jan 2011Mar 2019Past support
IBM end-of-sale bulletin ↗9117-570 · verified Aug 2026
IBM end-of-sale bulletin ↗9117-MMA · verified Aug 2026

Options from here

The IBM Power System 570 Server is past IBM end of service life. These are the paths teams take from here:

Third-party maintenance

Keep it in production past the OEM cutoff with an independent maintainer.

Pre-stock spares

Buy spares now, while units still circulate on the secondary market.

Plan replacement

It is unsupported today. Set a migration timeline and budget.

Run to failure

Low-criticality role: document the risk, harden backups, retire on your terms.

Independent and informational. EOSL.ai sells no hardware and no maintenance, and lists no paid placements. Third-party maintenance keeps unsupported gear in production past the OEM cutoff; whether it fits depends on the role the asset plays.

IBM Power System 570 Server — questions

Is the IBM Power System 570 Server end of life?

Yes. Every tracked Power System 570 Server SKU group is past its last date of support.

What is the last date of support for the Power System 570 Server?

Last dates of support across Power System 570 Server SKU groups range from Mar 2019 to Oct 2019.

Where do these Power System 570 Server dates come from?

Every end-of-sale and end-of-service-life date on this page links to the official IBM end-of-sale bulletin it was taken from.

On the same timetable

Embed this status on your wiki or README

A live badge that shows this model's support status and links here — it refreshes when the vendor date changes.

IBM Power System 570 Server EOL / EOSL status
<a href="https://eosl.ai/system/ibm-power-system-570-server/"><img src="https://eosl.ai/badge/ibm-power-system-570-server.svg" alt="IBM Power System 570 Server EOL / EOSL status"></a>
[![IBM Power System 570 Server EOL / EOSL status](https://eosl.ai/badge/ibm-power-system-570-server.svg)](https://eosl.ai/system/ibm-power-system-570-server/)