eosl.ai
homeIBMPower System IC922 Server

IBM Power System IC922 Server — End-of-Life & EOSL Dates

SUPPORT ENDING SOONIBM support ends December 2026.

IBM Power System IC922 Server enterprise server. End-of-support (last date of support / EOSL) date from IBM's Product Lifecycle, linked to the IBM lifecycle page for verification. The end-of-sale date shown is the IBM end-of-marketing date, published as "no longer available for order, withdrawn from market".

IBM Power System IC922 Server is still under IBM support, to Dec 2026. Fold the eventual replacement into your planning cycle.

Available

Jan 2020

End of sale

Dec 2021

Last date of support

Dec 2026

Part numbers

1

Check your part numbers in bulk Add to calendar

4

months of vendor support left

Support Runway Score40/100 · Action recommended
Why this score
  • End of service life within 6 months
  • Vendor-published date, source-linked
  • Category: enterprise server

Support-lifecycle timing and source confidence only. Higher means more runway. It is not a risk, safety or compliance rating. How it is calculated

Figure 1. Support runs to Dec 2026. Budget a refresh or line up cover before that date.

Part number in this family

All 1 share the dates above. Find your exact part to confirm.

Part numberDescriptionEnd of saleLast supportStatus
9183-22XIBM Power System IC922 Server (enterprise server)Dec 2021Dec 2026Ending soon

Options from here

IBM support for the IBM Power System IC922 Server ends soon. Weigh these before the cutoff:

Schedule migration

Support ends soon. Set the replacement window now, not mid-outage.

Line up third-party maintenance

Bridge coverage past the OEM cutoff if you can't migrate in time.

Budget the refresh

Get the replacement into this planning cycle.

Pre-stock spares

Secure spares before they get scarce after end-of-sale.

Independent and informational. EOSL.ai sells no hardware and no maintenance, and lists no paid placements. Third-party maintenance keeps unsupported gear in production past the OEM cutoff; whether it fits depends on the role the asset plays.

IBM Power System IC922 Server — questions

Is the IBM Power System IC922 Server end of life?

Not yet. All tracked Power System IC922 Server SKU groups are still within IBM support, though dates vary by SKU. See the breakdown below.

What is the last date of support for the Power System IC922 Server?

Dec 2026, per the IBM end-of-sale bulletin.

Where do these Power System IC922 Server dates come from?

Every end-of-sale and end-of-service-life date on this page links to the official IBM end-of-sale bulletin it was taken from.

On the same timetable

Embed this status on your wiki or README

A live badge that shows this model's support status and links here — it refreshes when the vendor date changes.

IBM Power System IC922 Server EOL / EOSL status
<a href="https://eosl.ai/system/ibm-power-system-ic922-server/"><img src="https://eosl.ai/badge/ibm-power-system-ic922-server.svg" alt="IBM Power System IC922 Server EOL / EOSL status"></a>
[![IBM Power System IC922 Server EOL / EOSL status](https://eosl.ai/badge/ibm-power-system-ic922-server.svg)](https://eosl.ai/system/ibm-power-system-ic922-server/)