eosl.ai
homeIBMPower System LC922 Server

IBM Power System LC922 Server — End-of-Life & EOSL Dates

SUPPORT ENDING SOONIBM support ends December 2026.

IBM Power System LC922 Server enterprise server. End-of-support (last date of support / EOSL) date from IBM's Product Lifecycle, linked to the IBM lifecycle page for verification. The end-of-sale date shown is the IBM end-of-marketing date, published as "no longer available for order, withdrawn from market".

IBM Power System LC922 Server is still under IBM support, to Dec 2026. Fold the eventual replacement into your planning cycle.

Available

Dec 2017

End of sale

Jun 2021 – Sep 2022

Last date of support

Dec 2026

Part numbers

3

IBM end-of-sale bulletin ↗5104-22C · verified Aug 2026
IBM end-of-sale bulletin ↗9006-22C · verified Aug 2026
IBM end-of-sale bulletin ↗9006-22P · verified Aug 2026
Check your part numbers in bulk Add to calendar

4

months of vendor support left

Support Runway Score40/100 · Action recommended
Why this score
  • End of service life within 6 months
  • Vendor-published date, source-linked
  • Category: enterprise server

Support-lifecycle timing and source confidence only. Higher means more runway. It is not a risk, safety or compliance rating. How it is calculated

Figure 1. Support runs to Dec 2026. Budget a refresh or line up cover before that date.

Part numbers in this family

Dates vary across 3 groups in this family, so every row carries its own. Find your exact part before you plan.

Part numberDescriptionEnd of saleLast supportStatus
5104-22CIBM Power System LC922 Server (enterprise server)Jun 2021Dec 2026Ending soon
9006-22CIBM Power System LC922 Server (enterprise server)Sep 2022Dec 2026Ending soon
9006-22PIBM Power System LC922 Server (enterprise server)Sep 2021Dec 2026Ending soon
IBM end-of-sale bulletin ↗5104-22C · verified Aug 2026
IBM end-of-sale bulletin ↗9006-22C · verified Aug 2026
IBM end-of-sale bulletin ↗9006-22P · verified Aug 2026

Options from here

IBM support for the IBM Power System LC922 Server ends soon. Weigh these before the cutoff:

Schedule migration

Support ends soon. Set the replacement window now, not mid-outage.

Line up third-party maintenance

Bridge coverage past the OEM cutoff if you can't migrate in time.

Budget the refresh

Get the replacement into this planning cycle.

Pre-stock spares

Secure spares before they get scarce after end-of-sale.

Independent and informational. EOSL.ai sells no hardware and no maintenance, and lists no paid placements. Third-party maintenance keeps unsupported gear in production past the OEM cutoff; whether it fits depends on the role the asset plays.

IBM Power System LC922 Server — questions

Is the IBM Power System LC922 Server end of life?

Not yet. All tracked Power System LC922 Server SKU groups are still within IBM support, though dates vary by SKU. See the breakdown below.

What is the last date of support for the Power System LC922 Server?

Dec 2026, per the IBM end-of-sale bulletin.

Where do these Power System LC922 Server dates come from?

Every end-of-sale and end-of-service-life date on this page links to the official IBM end-of-sale bulletin it was taken from.

On the same timetable

Embed this status on your wiki or README

A live badge that shows this model's support status and links here — it refreshes when the vendor date changes.

IBM Power System LC922 Server EOL / EOSL status
<a href="https://eosl.ai/system/ibm-power-system-lc922-server/"><img src="https://eosl.ai/badge/ibm-power-system-lc922-server.svg" alt="IBM Power System LC922 Server EOL / EOSL status"></a>
[![IBM Power System LC922 Server EOL / EOSL status](https://eosl.ai/badge/ibm-power-system-lc922-server.svg)](https://eosl.ai/system/ibm-power-system-lc922-server/)