eosl.ai
homeIBMPower System S914 Server

IBM Power System S914 Server — End-of-Life & EOSL Dates

PAST VENDOR SUPPORTIBM ended support in January 2026.

IBM Power System S914 Server enterprise server. End-of-support (last date of support / EOSL) date from IBM's Product Lifecycle, linked to the IBM lifecycle page for verification. The end-of-sale date shown is the IBM end-of-marketing date, published as "no longer available for order, withdrawn from market".

Every tracked IBM Power System S914 Server SKU group is past IBM end of service life (last group Jan 2026). Units in production should be treated as unsupported. For past-EOSL units, weigh third-party maintenance, spares, replacement, or a documented run-to-failure.

Available

Mar 2018

End of sale

Jan 2021

Last date of support

Jan 2026

Part numbers

1

Check your part numbers in bulk

7

months past last support

Support Runway Score26/100 · Little or no runway
Why this score
  • Past end of service life — 7 months ago
  • Vendor-published date, source-linked
  • Category: enterprise server

Support-lifecycle timing and source confidence only. Higher means more runway. It is not a risk, safety or compliance rating. How it is calculated

Figure 1. IBM issues no software maintenance and no security fixes for this product. Third-party maintenance, spares or replacement are the paths from here. EOSL.ai sells none of them and takes no placement fee.

Part number in this family

All 1 share the dates above. Find your exact part to confirm.

Part numberDescriptionEnd of saleLast supportStatus
9009-41AIBM Power System S914 Server (enterprise server)Jan 2021Jan 2026Past support

Options from here

The IBM Power System S914 Server is past IBM end of service life. These are the paths teams take from here:

Third-party maintenance

Keep it in production past the OEM cutoff with an independent maintainer.

Pre-stock spares

Buy spares now, while units still circulate on the secondary market.

Plan replacement

It is unsupported today. Set a migration timeline and budget.

Run to failure

Low-criticality role: document the risk, harden backups, retire on your terms.

Independent and informational. EOSL.ai sells no hardware and no maintenance, and lists no paid placements. Third-party maintenance keeps unsupported gear in production past the OEM cutoff; whether it fits depends on the role the asset plays.

IBM Power System S914 Server — questions

Is the IBM Power System S914 Server end of life?

Yes. Every tracked Power System S914 Server SKU group is past its last date of support.

What is the last date of support for the Power System S914 Server?

Jan 2026, per the IBM end-of-sale bulletin.

Where do these Power System S914 Server dates come from?

Every end-of-sale and end-of-service-life date on this page links to the official IBM end-of-sale bulletin it was taken from.

On the same timetable

Embed this status on your wiki or README

A live badge that shows this model's support status and links here — it refreshes when the vendor date changes.

IBM Power System S914 Server EOL / EOSL status
<a href="https://eosl.ai/system/ibm-power-system-s914-server/"><img src="https://eosl.ai/badge/ibm-power-system-s914-server.svg" alt="IBM Power System S914 Server EOL / EOSL status"></a>
[![IBM Power System S914 Server EOL / EOSL status](https://eosl.ai/badge/ibm-power-system-s914-server.svg)](https://eosl.ai/system/ibm-power-system-s914-server/)