eosl.ai
homeCambium NetworksCambiumPTP 48600

Cambium Networks PTP 48600 — End-of-Life & EOSL Dates

PAST VENDOR SUPPORTCambium Networks ended support in March 2022.

Cambium Networks PTP 48600 — end-of-sale and end-of-support dates by part number, as published by Cambium on its Product Life Cycle page.

Every tracked Cambium Networks PTP 48600 SKU group is past Cambium Networks end of service life (last group Mar 2022). Units in production should be treated as unsupported. For past-EOSL units, weigh third-party maintenance, spares, replacement, or a documented run-to-failure. Cambium Networks’s named migration path: PTP 670.

End of sale

Oct 2014 – Mar 2017

Last date of support

Mar 2022

Part numbers

16

Cambium Networks names PTP 670 as the migration pathper the linked bulletin · see its own dates
Check your part numbers in bulk

53

months past last support

Support Runway Score15/100 · Little or no runway
Why this score
  • Past end of service life — 53 months ago
  • Vendor-published date, source-linked
  • Vendor-named replacement / migration path available
  • Category: point-to-point wireless bridge

Support-lifecycle timing and source confidence only. Higher means more runway. It is not a risk, safety or compliance rating. How it is calculated

Figure 1. Cambium Networks issues no software maintenance and no security fixes for this product. Third-party maintenance, spares or replacement are the paths from here. EOSL.ai sells none of them and takes no placement fee.
Figure 2. The PTP 48600 against 7 other models in Cambium Networks. Each bar runs from the earliest milestone Cambium Networks publishes for that model, which is first availability where it gives one and end of sale otherwise, to its last date of support. The vertical rule is today; bars entirely to its left are past support. 57 further models in this line publish no usable date range and are not plotted.

Part numbers in this family

Dates vary across 2 groups in this family, so every row carries its own. Find your exact part before you plan.

Part numberDescriptionEnd of saleLast supportStatus
WB3378-HHPTP 48600 Full Integrated – Link CompleteMar 2017Mar 2022Past support
WB3379-HHPTP 48600 Full Connectorised – Link CompleteMar 2017Mar 2022Past support
WB3380-HHPTP 48600 Lite Integrated – Link CompleteMar 2017Mar 2022Past support
WB3381-HHPTP 48600 Lite Connectorised – Link CompleteMar 2017Mar 2022Past support
WB3382-HHPTP 48600 Full Integrated – End CompleteMar 2017Mar 2022Past support
WB3383-HHPTP 48600 Full Connectorised – End CompleteMar 2017Mar 2022Past support
WB3384-HHPTP 48600 Lite Integrated – End CompleteMar 2017Mar 2022Past support
WB3385-HHPTP 48600 Lite Connectorised – End CompleteMar 2017Mar 2022Past support
WB3378HHPTP 48600 Full Integrated – Link CompleteOct 2014Mar 2022Past support
WB3379HHPTP 48600 Full Connectorised – Link CompleteOct 2014Mar 2022Past support
WB3380HHPTP 48600 Lite Integrated – Link CompleteOct 2014Mar 2022Past support
WB3381HHPTP 48600 Lite Connectorised – Link CompleteOct 2014Mar 2022Past support
WB3382HHPTP 48600 Full Integrated – End CompleteOct 2014Mar 2022Past support
WB3383HHPTP 48600 Full Connectorised – End CompleteOct 2014Mar 2022Past support
WB3384HHPTP 48600 Lite Integrated – End CompleteOct 2014Mar 2022Past support
WB3385HHPTP 48600 Lite Connectorised – End CompleteOct 2014Mar 2022Past support

Options from here

The Cambium Networks PTP 48600 is past Cambium Networks end of service life. These are the paths teams take from here:

Third-party maintenance

Keep it in production past the OEM cutoff with an independent maintainer.

Pre-stock spares

Buy spares now, while units still circulate on the secondary market.

Plan replacement

It is unsupported today. Set a migration timeline and budget.

Run to failure

Low-criticality role: document the risk, harden backups, retire on your terms.

Independent and informational. EOSL.ai sells no hardware and no maintenance, and lists no paid placements. Third-party maintenance keeps unsupported gear in production past the OEM cutoff; whether it fits depends on the role the asset plays.

Cambium PTP 48600 — questions

Is the Cambium Networks PTP 48600 end of life?

Yes. Every tracked PTP 48600 SKU group is past its last date of support.

What is the last date of support for the PTP 48600?

Mar 2022, per the Cambium Networks end-of-sale bulletin.

Where do these PTP 48600 dates come from?

Every end-of-sale and end-of-service-life date on this page links to the official Cambium Networks end-of-sale bulletin it was taken from.

What is the replacement for the PTP 48600?

Cambium Networks's end-of-life bulletin lists PTP 670 as the recommended migration path for the PTP 48600. Exact per-part-number replacements are in the linked bulletin.

More Cambium Networks · compare all 150 models →

On the same timetable

Embed this status on your wiki or README

A live badge that shows this model's support status and links here — it refreshes when the vendor date changes.

Cambium Networks PTP 48600 EOL / EOSL status
<a href="https://eosl.ai/system/cambium-ptp-48600/"><img src="https://eosl.ai/badge/cambium-ptp-48600.svg" alt="Cambium Networks PTP 48600 EOL / EOSL status"></a>
[![Cambium Networks PTP 48600 EOL / EOSL status](https://eosl.ai/badge/cambium-ptp-48600.svg)](https://eosl.ai/system/cambium-ptp-48600/)