eosl.ai
homeDellMetro node

Dell Metro node — End-of-Life & EOSL Dates

UNDER VENDOR SUPPORTDell supports this to August 2030, with the earliest group ending June 2029.

Dell Metro node — storage virtualization. End-of-sale (Dell EOL) and end-of-standard-support (EOSS) dates from Dell’s published End-of-Life list (Dell KB 000185734).

Dell Metro node is still under Dell support, to Aug 2030 (earliest group Jun 2029). Fold the eventual replacement into your planning cycle.

Available

Jan 2021

End of sale

Jun 2024 – Aug 2025

Last date of support

Jun 2029 – Aug 2030

Part numbers

3

Dell End-of-Life list ↗verified Jul 2026
Check your part numbers in bulk Add to calendar

34

months of vendor support left

Support Runway Score78/100 · Watch
Why this score
  • End of service life within ~3 years
  • Vendor-published date, source-linked
  • Category: storage virtualization

Support-lifecycle timing and source confidence only. Higher means more runway. It is not a risk, safety or compliance rating. How it is calculated

Figure 1. Support runs to Aug 2030. Budget a refresh or line up cover before that date.

Part numbers in this family

Dates vary across 3 groups in this family, so every row carries its own. Find your exact part before you plan.

Part numberDescriptionEnd of saleLast supportStatus
mn-114Metro node storage virtualizationJun 2024Jun 2029Supported
mn-215Metro node storage virtualizationAug 2025Aug 2030Supported
mn-216Metro node storage virtualization — current productNot announcedNo EOL announced
Dell End-of-Life list ↗verified Jul 2026

Options from here

The Dell Metro node is still supported. Options to plan around, in rough priority:

Monitor the timeline

Supported for now. Track the end-of-service date and revisit at refresh planning.

Plan the refresh

Fold the eventual replacement into your multi-year budget.

Keep firmware current

Stay on a supported software train while under OEM support.

Third-party maintenance later

An option to extend life once the OEM cutoff nears.

Independent and informational. EOSL.ai sells no hardware and no maintenance, and lists no paid placements. Third-party maintenance keeps unsupported gear in production past the OEM cutoff; whether it fits depends on the role the asset plays.

Dell Metro node — questions

Is the Dell Metro node end of life?

Not yet. All tracked Metro node SKU groups are still within Dell support, though dates vary by SKU. See the breakdown below.

What is the last date of support for the Metro node?

Last dates of support across Metro node SKU groups range from Jun 2029 to Aug 2030.

Where do these Metro node dates come from?

Every end-of-sale and end-of-service-life date on this page links to the official Dell End-of-Life list it was taken from.

On the same timetable

Embed this status on your wiki or README

A live badge that shows this model's support status and links here — it refreshes when the vendor date changes.

Dell Metro node EOL / EOSL status
<a href="https://eosl.ai/system/dell-metro-node/"><img src="https://eosl.ai/badge/dell-metro-node.svg" alt="Dell Metro node EOL / EOSL status"></a>
[![Dell Metro node EOL / EOSL status](https://eosl.ai/badge/dell-metro-node.svg)](https://eosl.ai/system/dell-metro-node/)