eosl.ai
homeDellVxFlex Ready Node

Dell VxFlex Ready Node — End-of-Life & EOSL Dates

UNDER VENDOR SUPPORTDell supports this to September 2029, with the earliest group ending August 2028.

Dell VxFlex Ready Node — converged infrastructure. End-of-sale (Dell EOL) and end-of-standard-support (EOSS) dates from Dell’s published End-of-Life list (Dell KB 000185734).

Dell VxFlex Ready Node is still under Dell support, to Sep 2029 (earliest group Aug 2028). Fold the eventual replacement into your planning cycle.

Available

Aug 2019

End of sale

Aug 2023 – Sep 2024

Last date of support

Aug 2028 – Sep 2029

Part numbers

3

Dell End-of-Life list ↗verified Jul 2026
Check your part numbers in bulk Add to calendar

24

months of vendor support left

Support Runway Score64/100 · Plan
Why this score
  • End of service life within ~2 years
  • Vendor-published date, source-linked
  • Category: converged infrastructure

Support-lifecycle timing and source confidence only. Higher means more runway. It is not a risk, safety or compliance rating. How it is calculated

Figure 1. Support runs to Sep 2029. Budget a refresh or line up cover before that date.

Part numbers in this family

Dates vary across 2 groups in this family, so every row carries its own. Find your exact part before you plan.

Part numberDescriptionEnd of saleLast supportStatus
VxFlex Ready Node R740xdVxFlex Ready Node converged infrastructureAug 2023Aug 2028Supported
VxFlex Ready Node R640VxFlex Ready Node converged infrastructureAug 2023Aug 2028Supported
VxFlex Ready Node R840VxFlex Ready Node converged infrastructureSep 2024Sep 2029Supported
Dell End-of-Life list ↗verified Jul 2026

Options from here

The Dell VxFlex Ready Node is still supported. Options to plan around, in rough priority:

Monitor the timeline

Supported for now. Track the end-of-service date and revisit at refresh planning.

Plan the refresh

Fold the eventual replacement into your multi-year budget.

Keep firmware current

Stay on a supported software train while under OEM support.

Third-party maintenance later

An option to extend life once the OEM cutoff nears.

Independent and informational. EOSL.ai sells no hardware and no maintenance, and lists no paid placements. Third-party maintenance keeps unsupported gear in production past the OEM cutoff; whether it fits depends on the role the asset plays.

Dell VxFlex Ready Node — questions

Is the Dell VxFlex Ready Node end of life?

Not yet. All tracked VxFlex Ready Node SKU groups are still within Dell support, though dates vary by SKU. See the breakdown below.

What is the last date of support for the VxFlex Ready Node?

Last dates of support across VxFlex Ready Node SKU groups range from Aug 2028 to Sep 2029.

Where do these VxFlex Ready Node dates come from?

Every end-of-sale and end-of-service-life date on this page links to the official Dell End-of-Life list it was taken from.

On the same timetable

Embed this status on your wiki or README

A live badge that shows this model's support status and links here — it refreshes when the vendor date changes.

Dell VxFlex Ready Node EOL / EOSL status
<a href="https://eosl.ai/system/dell-vxflex-ready-node/"><img src="https://eosl.ai/badge/dell-vxflex-ready-node.svg" alt="Dell VxFlex Ready Node EOL / EOSL status"></a>
[![Dell VxFlex Ready Node EOL / EOSL status](https://eosl.ai/badge/dell-vxflex-ready-node.svg)](https://eosl.ai/system/dell-vxflex-ready-node/)